KGH-PH2//CAPABILITY DOMAINS: PLANE TASKS & OPENMAINT BIM
Tasks, Cycles & 3D BIM Defect Pinning
Sprint cycle board mapped to Plane.io Kuratibu bridge, linked directly to OpenMAINT IFC spatial 3D coordinate pins.
Sprint 14: Level 5 Structural Frame (Plane.io Kuratibu Bridge)
ESCROW GATE GATEDtsk_pln_1001
highin progress
Reinforcement Fixing - Grid 3-6 Floor 5 Slab
Tie bottom and top mat Y12/Y16 rebar per structural drawing S-05-02.
MODULE:Superstructure Concrete
ASSIGNEE:Samson Kiprono (Steel Crew)
DUE DATE:2026-09-30
ESCROW RELEASE MILESTONE LINKED
tsk_pln_1002
urgentinspection ready
MEP Electrical Conduiting Inspection Sign-Off
Pre-pour conduit check by SP3 MEP engineer before slab shuttering close.
MODULE:Superstructure Concrete
ASSIGNEE:Arch. Dennis Mutiso (SP3 MEP)
DUE DATE:2026-10-01
ESCROW RELEASE MILESTONE LINKED
INSPECTOR SIGN-OFF PENDING